Filtered by vendor Oracle
Subscribe
Filtered by product Primavera P6 Enterprise Project Portfolio Management
Subscribe
Total
58 CVE
CVE | Vendors | Products | Updated | CVSS v2 | CVSS v3 |
---|---|---|---|---|---|
CVE-2021-2351 | 1 Oracle | 111 Advanced Networking Option, Agile Engineering Data Management, Agile Plm and 108 more | 2024-02-16 | 5.1 MEDIUM | 8.3 HIGH |
Vulnerability in the Advanced Networking Option component of Oracle Database Server. Supported versions that are affected are 12.1.0.2, 12.2.0.1 and 19c. Difficult to exploit vulnerability allows unauthenticated attacker with network access via Oracle Net to compromise Advanced Networking Option. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Advanced Networking Option, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in takeover of Advanced Networking Option. Note: The July 2021 Critical Patch Update introduces a number of Native Network Encryption changes to deal with vulnerability CVE-2021-2351 and prevent the use of weaker ciphers. Customers should review: "Changes in Native Network Encryption with the July 2021 Critical Patch Update" (Doc ID 2791571.1). CVSS 3.1 Base Score 8.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:C/C:H/I:H/A:H). | |||||
CVE-2020-36518 | 4 Debian, Fasterxml, Netapp and 1 more | 36 Debian Linux, Jackson-databind, Active Iq Unified Manager and 33 more | 2023-12-10 | 5.0 MEDIUM | 7.5 HIGH |
jackson-databind before 2.13.0 allows a Java StackOverflow exception and denial of service via a large depth of nested objects. | |||||
CVE-2021-45105 | 5 Apache, Debian, Netapp and 2 more | 121 Log4j, Debian Linux, Cloud Manager and 118 more | 2023-12-10 | 4.3 MEDIUM | 5.9 MEDIUM |
Apache Log4j2 versions 2.0-alpha1 through 2.16.0 (excluding 2.12.3 and 2.3.1) did not protect from uncontrolled recursion from self-referential lookups. This allows an attacker with control over Thread Context Map data to cause a denial of service when a crafted string is interpreted. This issue was fixed in Log4j 2.17.0, 2.12.3, and 2.3.1. | |||||
CVE-2021-44832 | 5 Apache, Cisco, Debian and 2 more | 22 Log4j, Cloudcenter, Debian Linux and 19 more | 2023-12-10 | 8.5 HIGH | 6.6 MEDIUM |
Apache Log4j2 versions 2.0-beta7 through 2.17.0 (excluding security fix releases 2.3.2 and 2.12.4) are vulnerable to a remote code execution (RCE) attack when a configuration uses a JDBC Appender with a JNDI LDAP data source URI when an attacker has control of the target LDAP server. This issue is fixed by limiting JNDI data source names to the java protocol in Log4j2 versions 2.17.1, 2.12.4, and 2.3.2. | |||||
CVE-2021-2366 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 5.5 MEDIUM | 6.4 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.12.0-17.12.20, 18.8.0-18.8.23, 19.12.0-19.12.14 and 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. While the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 6.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:C/C:L/I:L/A:N). | |||||
CVE-2021-2386 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 4.0 MEDIUM | 4.3 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 20.12.0-20.12.3. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N). | |||||
CVE-2020-5421 | 3 Netapp, Oracle, Vmware | 38 Oncommand Insight, Snap Creator Framework, Snapcenter and 35 more | 2023-12-10 | 3.6 LOW | 6.5 MEDIUM |
In Spring Framework versions 5.2.0 - 5.2.8, 5.1.0 - 5.1.17, 5.0.0 - 5.0.18, 4.3.0 - 4.3.28, and older unsupported versions, the protections against RFD attacks from CVE-2015-5211 may be bypassed depending on the browser used through the use of a jsessionid path parameter. | |||||
CVE-2020-14706 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 4.0 MEDIUM | 5.9 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0.0-17.12.17.1, 18.1.0.0-18.8.19 and 19.12.0-19.12.5. Difficult to exploit vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.9 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:H/PR:N/UI:R/S:U/C:H/I:L/A:N). | |||||
CVE-2020-14653 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 5.5 MEDIUM | 5.4 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 16.1.0.0-16.2.20.1, 17.1.0.0-17.12.17.1 and 18.1.0.0-18.8.18.2. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.1 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.1/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:L/A:N). | |||||
CVE-2020-2706 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 5.8 MEDIUM | 5.4 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N). | |||||
CVE-2020-2594 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 6.0 MEDIUM | 6.5 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Project Manager). Supported versions that are affected are 16.2.0.0 - 16.2.19.3, 17.12.0.0 - 17.12.17.0, 18.8.0.0 - 18.8.18.0, 19.12.1.0 - 19.12.3.0 and 20.1.0.0 - 20.2.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 6.5 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:L). | |||||
CVE-2020-10683 | 5 Canonical, Dom4j Project, Netapp and 2 more | 38 Ubuntu Linux, Dom4j, Oncommand Api Services and 35 more | 2023-12-10 | 7.5 HIGH | 9.8 CRITICAL |
dom4j before 2.0.3 and 2.1.x before 2.1.3 allows external DTDs and External Entities by default, which might enable XXE attacks. However, there is popular external documentation from OWASP showing how to enable the safe, non-default behavior in any application that uses dom4j. | |||||
CVE-2019-3020 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 5.8 MEDIUM | 9.3 CRITICAL |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 15.1.0-15.2.18, 16.1.0-16.2.18, 17.1.0-17.12.14 and 18.1.0-18.8.11. Easily exploitable vulnerability allows unauthenticated attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 9.3 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:N/UI:R/S:C/C:H/I:H/A:N). | |||||
CVE-2020-2707 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 4.9 MEDIUM | 5.4 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: WebAccess). Supported versions that are affected are 15.1.0.0-15.2.18.7, 16.1.0.0-16.2.19.0, 17.1.0.0-17.12.16.0, 18.1.0.0-18.8.16.0 and 19.12.0.0. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized update, insert or delete access to some of Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 5.4 (Confidentiality and Integrity impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:L/I:L/A:N). | |||||
CVE-2019-17091 | 2 Eclipse, Oracle | 23 Mojarra, Application Testing Suite, Banking Enterprise Product Manufacturing and 20 more | 2023-12-10 | 4.3 MEDIUM | 6.1 MEDIUM |
faces/context/PartialViewContextImpl.java in Eclipse Mojarra, as used in Mojarra for Eclipse EE4J before 2.3.10 and Mojarra JavaServer Faces before 2.2.20, allows Reflected XSS because a client window field is mishandled. | |||||
CVE-2020-2556 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 4.4 MEDIUM | 7.3 HIGH |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Core). Supported versions that are affected are 16.2.0.0-16.2.19.0, 17.12.0.0-17.12.16.0, 18.8.0.0-18.8.16.0, 19.12.0.0 and 20.1.0.0. Easily exploitable vulnerability allows low privileged attacker with logon to the infrastructure where Primavera P6 Enterprise Project Portfolio Management executes to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized creation, deletion or modification access to critical data or all Primavera P6 Enterprise Project Portfolio Management accessible data as well as unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data and unauthorized ability to cause a partial denial of service (partial DOS) of Primavera P6 Enterprise Project Portfolio Management. CVSS 3.0 Base Score 7.3 (Confidentiality, Integrity and Availability impacts). CVSS Vector: (CVSS:3.0/AV:L/AC:L/PR:L/UI:R/S:C/C:L/I:H/A:L). | |||||
CVE-2019-2976 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 3.5 LOW | 6.8 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management product of Oracle Construction and Engineering (component: Web Access). Supported versions that are affected are 17.1.0-17.12.12. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks require human interaction from a person other than the attacker and while the vulnerability is in Primavera P6 Enterprise Project Portfolio Management, attacks may significantly impact additional products. Successful attacks of this vulnerability can result in unauthorized access to critical data or complete access to all Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 6.8 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:R/S:C/C:H/I:N/A:N). | |||||
CVE-2019-10219 | 3 Netapp, Oracle, Redhat | 195 Active Iq Unified Manager, Element, Management Services For Element Software And Netapp Hci and 192 more | 2023-12-10 | 4.3 MEDIUM | 6.1 MEDIUM |
A vulnerability was found in Hibernate-Validator. The SafeHtml validator annotation fails to properly sanitize payloads consisting of potentially malicious code in HTML comments and instructions. This vulnerability can result in an XSS attack. | |||||
CVE-2019-2701 | 1 Oracle | 1 Primavera P6 Enterprise Project Portfolio Management | 2023-12-10 | 4.0 MEDIUM | 4.3 MEDIUM |
Vulnerability in the Primavera P6 Enterprise Project Portfolio Management component of Oracle Construction and Engineering Suite (subcomponent: Web Access). The supported version that is affected is 18.8. Easily exploitable vulnerability allows low privileged attacker with network access via HTTP to compromise Primavera P6 Enterprise Project Portfolio Management. Successful attacks of this vulnerability can result in unauthorized read access to a subset of Primavera P6 Enterprise Project Portfolio Management accessible data. CVSS 3.0 Base Score 4.3 (Confidentiality impacts). CVSS Vector: (CVSS:3.0/AV:N/AC:L/PR:L/UI:N/S:U/C:L/I:N/A:N). | |||||
CVE-2018-1288 | 3 Apache, Oracle, Redhat | 5 Kafka, Database, Primavera P6 Enterprise Project Portfolio Management and 2 more | 2023-12-10 | 5.5 MEDIUM | 5.4 MEDIUM |
In Apache Kafka 0.9.0.0 to 0.9.0.1, 0.10.0.0 to 0.10.2.1, 0.11.0.0 to 0.11.0.2, and 1.0.0, authenticated Kafka users may perform action reserved for the Broker via a manually created fetch request interfering with data replication, resulting in data loss. |